Projects

Overview of completed infrastructure projects and supervision experience across different sectors.

Hot-In-Place Recycling Asphalt Works 2015
Supervision

Hot-In-Place Recycling Asphalt Works 2015

During the hot-in-place recycling works, the pavement was rehabilitated within the existing road limits. Additional profile milling and pothole repairs were also carried out on some sections. As part of the project, approximately 65 km of roads in nine different sections across Estonia were paved on top of hot-recycled base layers over a six-month period. In total, more than 650,000 m2 of asphalt wearing course was laid. Particular attention during supervision was paid to the temperature of the asphalt being placed, and thermal cameras were used for this purpose. The construction value of the project exceeded EUR 4.9 million.

Viira Fish Pass
Supervision

Viira Fish Pass

In 2015, an artificial rapid was created across the full width of the river at the location of the former dam. The rapid is about 18 m long and about 11 m wide, with a fall of 0.7 m, or 3.8%. The lower layer consists of boulders and crushed stone covered with geotextile. Larger boulders with diameters from 100 to 1100 mm were placed on the textile in a checkerboard pattern, and the surrounding areas were covered with a 0.2 to 0.4 m layer of smaller stones. To allow canoeists to pass, a deeper and more evenly graded channel approximately 2 m wide was formed along the right bank of the river.