Project overview
In 2012 and 2013, Phase 4 of the Tartu west bypass was built, with a construction value of nearly EUR 15 million.
See also the supervision video covering the full project.
The project included reconstruction of the section of Road T-2 Tallinn-Tartu-Voru-Luhamaa between Ringtee and Lemmatsi at km 187.35-189.12. It also included construction of stormwater sewerage, pedestrian and bicycle paths and a noise barrier wall. In addition, the road overpass and railway overpass with retaining walls were built. During construction of the railway overpass, rail traffic was diverted onto a temporary railway line built next to the existing line.